We are using the 62MZ Calculator spreadsheet for an office building. The HVAC system does not utilize VAV boxes or any kind of terminal unit. Rather, it just feeds directly into each space. How do we fill in the CFM (Vdzd) cell for the critical zones? Do we need to calculate it from the space load, measure it, or can we just use a conservative engineering rule of thumb? Thank you in advance for any help here.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.