Forum quick links
Primary Secondary Pumping Power
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
When modeling a project that has a baseline building requiring system #8, the system cooling tonnage is > 600 tons therefore G3.1.3.10.
Humidifier / Economizer / Energy Recovery
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hi, I would like to ask 3 simple questions: 1) if a humidifier in proposed AHU is presented, can it be considered as a process load and thus modeled in baseline?
EAp2 Submittal Form problem
CS-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Dear all, I have just completed the EAp2 submittal with all the info and uploads associated, but when I put "Check Compliance", it does not turns the "N" (no) to a "Y" (yes).
Using Lease Agreement for Undesigned Elements
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I am wondering if the tenant lease agreement can be used to specify undesigned elements for EAp2 similar to how it is used to achieve other credits.
buildings in and out the boundary share the same heating source
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear Sir, There is a project with a office tower ,a hotel tower above the fifth storeys and a commercial podium below the fifth storeys.
Existing building with extension
CS-2009 EAp2:Minimum Energy Performanceposted by Eleftherios Zacharakis on
Our project is an extension building that undergoes a major renovation on the HVAC-system and interior, but not exterior envelope, and even gets a new extension.
heat recovery system for base case ?
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum Energy Performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.
How to calculate Process Energy for CS?
CS-2009 EAp2:Minimum Energy Performanceposted by Tatjana Ernst on
Hi everyone, we have an Core & Shell-Office Building. We are wondering how we have to calculate the process energy.
Exterior LPD addendum i and 90.1-2010
CS-2009 EAp2:Minimum Energy Performanceposted by Martin K on
Hi, what surface type should be used for overhang construction if using Addendum i or 90.1-2010 version?