Post a question or comment
Credit Filters
Measurement and Verification—Base Building
Filter by location
Forum
Topic
Replies
Recent
1
Mon Aug 16, 2010, 4:36 pm

Energy Model Calibration by Post Construction data

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Gabriela Hernández Castillo  on 

Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.

1
Mon Jul 8, 2013, 6:37 pm

Sub Metering of Service Hot Water (Domestic Hot Water)

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.

1
Fri Jan 8, 2016, 2:25 am

Tenant Submetering connected to BMS?

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Marco Abdallah  on 

We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.

1
Fri Aug 24, 2012, 12:58 pm

Separating lighting metering from plug load metering.

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Rudolph Carneiro  on 

I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.

1
Fri Oct 25, 2013, 1:22 pm

Model Calibration - Margins for Error

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

For a new office building would it be acceptable to use these error margins for an M&V Report.

1
Fri Apr 21, 2017, 5:07 pm

EA Credit 5.1: Base Building Sub-metering

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ian McCall  on 

Hello all, I am working on a large Core and Sheel project composed of office spaces and commercial centre (in France). The comercial centre is 5 stories high and occupied by one single tenant.

1
Wed Jun 4, 2014, 11:48 pm

EAc5.1 Review Report Help

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Redy Truccolo  on 

Hi, I received these technical advices but I don't really understand what they're asking me to add to the M&V Plan: 1.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Tue May 2, 2017, 6:22 pm

Speculative Retail - No Meters Provided.

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Im working on a mixed use development that consists of office space and retail units.

2
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Thu Dec 8, 2016, 5:17 pm

Emergency Power

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Brightworks Sustainability  on 

The engineer on my project is asking what exactly needs to be submetered and I'm having difficulty answering just because I'm not as familiar with the credit details.

5
Fri Sep 23, 2016, 2:28 pm