Cold Dark Shell - M&V Question
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Brightworks Sustainability on
I'm working on a cold dark shell project where the tenant will be building out the full HVAC and BMS system.
Exemplary Performance for EAc5.1
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Hello, I have seen in the form version 4.0 of leedonline for EAc5.1 that in the ADITIONAL DETAILS, there is an option (check box) that says: 'The Project is pursuing exemplary performance for EA
100% Tenant
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Emmanuel Pauwels on
We are working in a project that will have a single tenant occupying the whole building.
Lighting measurement
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m
Deciding to choose Option 1(D) or Option 2(B)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by James Keohane on
I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.
Quality Assurance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Can anyone help with the following LEED reviewer comment that we received.
EAc5.1 Review Report Help
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Redy Truccolo on
Hi, I received these technical advices but I don't really understand what they're asking me to add to the M&V Plan: 1.
Speculative Retail - No Meters Provided.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Im working on a mixed use development that consists of office space and retail units.
Emergency Power
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Brightworks Sustainability on
The engineer on my project is asking what exactly needs to be submetered and I'm having difficulty answering just because I'm not as familiar with the credit details.