CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Emmanuel Gee on
Can basic manual operated fabric shades be used for areas that are above 500fc? Something such as a Draper Manual Flexshade? Thanks
Blinds for glare control - manual or automated
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by shashank jain on
Seen some of the comments up there... But I wanted to ask if the blinds that are required as part of the glare control in IEQ 8.1 ... can they be simple manually controlled internal blinds...
Regularly Occupied Spaces
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular
output summary
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?
Partition walls after C&S contruction work
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Ricardo Sá on
An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.
View perserving automated shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Edwin van Eeckhoven on
Dear All, What is exactly the definition of "automated" with regard to the shades when using option 2 for this credit, and would manually operated electric blinds be compliant when VLT x WFR >
New Calculation Spreadsheet
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Yelena Gipsov on
Hello! I am working with the new Supplemental Daylight and Views Calculation Spreadsheet, prescriptive option. There is a column "Glare Control Type for spaces with VLT X WFR > 0.18".
No Tenant Fit Out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Kimberlyn Caoagas on
I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?