ASHRAE 90.1 mandatory requirement for daylight dimming not met in many projects
NC-v4 EAp2:Minimum energy performanceposted by TANVEER ANSARI on
Hi,
We have been facing this problem on each and every new project in the region.
Individual workstation controls - Are they really needed?
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
So I need to ask this general question regarding the lighting controls section of this credit.
Natural Gas as process loads
NC-v4 EAp2:Minimum energy performanceposted by A&L SUSTENTABILIDADE on
Dear forum users,
We are modeling a manufacturing building that uses natural gas in its welding processes.
Should the natural gas consumption be included in the energy simulation?
Metering heat pumps with shared ATES system
NC-v4 EAc3:Advanced energy meteringposted by Yara Ibrahim on
All heating/cooling in our building project is supplied by a heat pump, fed from an ATES system that is shared with other buildings on the property.
Number of fixtures assumption for tenant spaces
CS-v4 WEc4:Water meteringposted by Junaid Mujahid on
Hi Forum Users!
Construction Waste Tracking Source Separated Question for Concrete and Asphalt Crushed for Aggregate
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Gorder on
I have been a Sustainability/ LEED Consultant in Portland, OR, since starting my business in 2009, and recently am going back to school so to speak about Construction Waste Tracking due to a Muultn
LEED Campus Master Site - Individual project and Group project
NC-v4 LTc6:Bicycle facilitiesposted by Edgar Arevalo on
I'm working on a police firing range and training facility.
Is the "No Cooling Tower" ACP still available?
NC-v4 WEc3:Cooling tower water useposted by Deborah Lucking on
The LEED Credit Library still mentions the ACP "No Cooling Tower" under "Pilot Credit".
The Pilot Credit is now closed; are we still able to submit as an ACP under this Credit?
Social equity within the project team
CS-v4 IPc1:Integrative processposted by Rihab Joucht on
My company has an ESG report, and im expecting to target the pilot credit Social equity within the project team
Is JUST or B CORP mandatory ?