Tenant chilled water metering
CS-v4 EAc3:Advanced energy meteringposted by Eunsun Cho on
Hi all, I have a question regarding the EA Credit: Advanced Energy Metering under LEED v4 BD+C: Core and Shell.
Option 1, Option 2 or both?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Phillip Galanos on
I am trying to find confirmation that completing both options 1 & 2 will give my project more points than just completing one or the other.
Wetlands as open space?
NC-v4 SSc3:Open spaceposted by Deborah Lucking on
"For projects that achieve a density of 1.5 floor-area ratio (FAR), and are physically accessible, extensive or intensive vegetated roofs can be used toward the minimum 25% vegetation requirement,
Cafe Space / Commerical Kitchen in New Construction Project
NC-v4 WEp2:Indoor water use reductionposted by Crista Shopis on
The new construction project I'm working on will include a cafe space with a commercial prep kitchen.
Geo WSHP + DOAS Fans over 10% Building Energy Usage requiring submetering
Schools-NC-v4 EAp2:Minimum energy performanceposted by Shawna Winters on
My project has fans consuming more than 10% of the building's energy on a geothermal system with WSHPs and a decoupled DOAS system, that are requiring submetering to satisfy the advanced energy met
Innovation: Hydroponic indoor gardens
NC-v4 INc1:Innovationposted by Theresa Lehman on
Has anyone submitted and achieved an Innovation credit for hydroponic indoor gardens?
Furniture Installation vs. Occupancy
CI-v4 EQc4:Indoor air quality assessmentposted by Michelle Rosenberger on
If the project schedule indicates that move in will occur prior to the completion of furniture installation, can this credit be achieved by flush out?