Forum quick links
Which Option 2 strategies for a warehouse hall?
Warehouses-NC-v4 EQc6:Interior lightingposted by Frantisek Macholda on
Hello,
Long-term vs. Short-term and combining the two
Healthcare-v4 LTc6:Bicycle facilitiesposted by Hannah Walter on
It seems like it would be, but it's not really clear...can long-term and short-term bicycle storage be in the same location. So say 4 short-term spaces are required per the calculations, and
Tenant Terrace
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Ilana Judah on
Are doors to an upper floor roof terrace of a tenant office space considered a regularly used exterior entrance requiring an entryway system?
HVAC System Selection
NC-v4 IPc1:Integrative processposted by Dave Hubka on
It doesn't seem like the credit requires evaluation of various HVAC systems (e.g. radiant heat vs forced air heat, packaged cooling vs split systems, etc.).
LEED Call for Proposals Now Open through 5/31
CI-v4 WEp1:Indoor water use reductionposted by Emma Hughes on
Have an idea for the next version of LEED? We want to hear from you!
Is Sales/Tenant agreement mandatory to comply this credit?
CS-v4 EQc5:Quality viewsposted by Mauricio Ramirez on
Hello.
Private and Public Parking
CS-v4 LTc7:Reduced parking footprintposted by CT G on
We are working on a project that includes parking in below grade levels under the building.
LCA on existing building
NC-v4 MRc1:Building life-cycle impact reductionposted by Emmanuel Pauwels on
The LEED reference guide for this credit states that the LCA option can only be used on new buildings or extensions to existing buildings.
Turf Grass Flooring
CI-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
My project is interested in installing turf grass indoors. The product reads like flooring with treated yarns, solid backing, pile heights, etc.