NC-v4 SSc4:Rainwater managementposted by Jorge Mato Rial on
Hello Everyone! I am working in a project, which includes the following types of surfaces: -Impervious roof areas -Garden areas -Impervious vehicle circulation areas -Parking area with green paveme
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.
Mechanical Equipment Finishes
NC-v4 EQc2:Low emitting materialsposted by Samer Alhmdan on
Hello, Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Low-emitting requirements for fabrics?
Retail-CI-v4 EQc2:Low emitting materialsposted by Joanna Peacock on
Hi, My project is a retail fit-out where they are introducing bespoke-made furniture such as sofas and stools.
Energy Performance for Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Jeff Halliwell on
I'm working on modeling a restaurant under ASHRAE 90.1 2010. One of the issues is the main source of heating is a hybrid electric/gas system with majority of it being electric (i.e. strip heat).
Building on existing peer but parking on "reclaimed" land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Eesmyal Santos-Brault on
Our project will include a renovation and expansion of an existing building on an existing peer in the ocean, so it meets MPR 1, but the owner plans to add a new peer to build a parking lot adjacen
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
Project Currently Running at 10 Cyc - Am I eligible for 3 pts
EBOM-v4 WEc3:Cooling tower water useposted by Robert Cox on
Hello - Based on the water analysis provided by our vendor, we can achieve 11 cycles prior to requiring treatment. We are currently using 10 cycles. Does this qualify for 2 or 3 points?
Definition of Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Yoyo Shek on
Does the road (for vehicle) is classified as bicycle paths?