Forum quick links
Informal Bus Services
NC-v4 LTc5:Access to quality transitposted by Ben Pratt on
I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.
Paints Low Emissions
CI-v4 EQc2:Low emitting materialsposted by Gabriela Mena on
Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Lighting Boundary Line
NC-v4 SSc6:Light pollution reductionposted by Gregory Martin on
Working on a project where the property line is adjacent to a railroad track operated by a private railway company(BNSF).
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
Preferred Parking a must for EVSE vehicles ?
NC-v4 LTc8:Green vehiclesposted by deepak cherukumilli on
Is 2% of total parking spaces for EVSE vehicles required to be preferred parking or can be any parking spaces. Green Vehicles credit language doesnot mention about this.
Museum/Galleries Regularly Occupied Spaces
NC-v4 EQc8:Quality viewsposted by Sefa Sahin on
Hello, Our project building include mostly museum/galleries and lobbies. The project building is very close the sea and has amazing landscape.
VENTILATION WAREHOUSES
Warehouses-EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Helena Garcia on
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. The question is for the warehouse, this warehouse is not conditioned and the spa
Option 3 tracking
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Tommy Linstroth on
It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?