Lighting Boundary if property boundary abuts parking spaces off of a public roadway?

NC-v4 SSc6:Light pollution reduction
posted by  Crista Shopis  on 

Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.

3
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Wed Oct 8, 2025, 7:27 pm

Contaminated Soil

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Magdalena Kolodziej Rivas  on 

If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.  

0

LCA: is waste % required?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Alexandra Kravel  on 

I'm curious if % of materials waste is typically included in the LEED LCA analysis? Not seeing a specific language for it on the LEED guide.

0

What happened to VOC content?

Mid-Rise-v4 EQc7:Low-emitting products
posted by  Michelle Rosenberger  on 

In the 2008 MFMR system, VOC content was under the material credit Environmentally Preferred Products. Now in v4 there is Low Emitting but it doesn't include VOC content just emissions.

0

Modeling Process Hot water

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi, I am working on a test and reliability manufacturing facility, where we are using close to 65,000 gals of water for process load, what should be a good assumption to figure out how much of that

0

Pilot Credit LTpc134 - Advanced Transportation Monitoring Systems Pilot credits

CS-v4 INc1:Innovation
posted by  Adriana Hansen  on 

For the Advanced Transportation Monitoring Systems pilot credit, do we need to count only people tracked through access control (turnstiles), or also visitors who just stay in the lobby or

0

Office space only going for partial renovation.

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  shashank gangil  on 
We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors.
11
Tue Sep 30, 2025, 9:33 am

Whether to just upload the Tables of contents for Fundamental Cx documentation review?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  zz kelvin  on 

When a document is submitted for review, is it understood that only the tables of contents  needs to be uploaded, and the detailed document content does not need to be uploaded?

5
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Wed Sep 24, 2025, 7:25 pm