Forum quick links
Clarification and Application of LEED v4 for District Energy Systems Using the Large-Scale DES Calculator
NC-v4 EAp2:Minimum energy performanceposted by G.J. Teunissen on
I am working on a building project in the Netherlands that will utilize district heating.
ASHRAE 90.1.2010 and receptacle loads
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all,
I have following questions concerning ASHRAE 90.1.2010 and receptacle loads:
Is this runoff volume calculation correct?
NC-v4 SSc4:Rainwater managementposted by SOYOUNG CHO on
Hello everyone,
Schedule for Lighting, Occupancy, & Plug Loads
NC-v4 EAp2:Minimum energy performanceposted by junaid naseer on
We are working on a Hospital Project outside USA and we are going though option 1 i.e. whole building energy simulation.
According to ASHRAE 90.1, Is it mandatory to install occuppant sensors in electrical and mechanical rooms?
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
According to ASHRAE 90.1 / Section 9.4.1.2 , Do we have to install occupant sensor or a timer switch in electrical and mechanical rooms?
Thanks,
Clarification on "Size Category (Input)" in ASHRAE 90.1-2010 Table 7.8
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi everyone,
Contact Adhesives - Testing conducted for "Open Plan Office Environment"
NC-v4 EQc2:Low emitting materialsposted by Sean Smith on
I'm looking for a contact adhesive for a client and I can't seem to find any complaint product with CDPH testing that is tested to the private office scenario.
eQuest for international projects - Default climate data and other pre-installed databases missing
CS-v4 EAp2:Minimum energy performanceposted by Marine Petrosyan on
Hi All!
LTc Bicycle Facilities Vincinity Map
NC-v4 LTc6:Bicycle facilitiesposted by Theresa Lehman on
I am working on a project seeking LEED certification located in a small rural community.
IEQ PreReq - Carbon monoxide monitoring
NC-v4 EQp1:Minimum indoor air quality performanceposted by Kim C on
The pre-requisite criteria speaks of having Carbon monoxide monitors installed in each dwelling unit.