NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello, I am modeling a bulding where wine is made (don´t know how to say it in English, sorry), the thing is that there are many spaces in the project that have AHU just to process or store the wi
Museum additional interior lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hello,
U value requirement for " Roof Hatch"
NC-2009 EAp2:Minimum Energy Performanceposted by Faisal on
Hi...
Does the proposed or basleine U or SHGC value requirement for the ROOF construction would also be applicable of " Roof Hatch"?
Can two chillers share one cooling tower?
NC-2009 EAp2:Minimum Energy Performanceposted by Xing Shi on
Per ASHRAE 90 G3.1.3.11: Each chiller shall be modeled with separate condenser water and chilled-water pumps interlocked to operate with the associated chiller. We have two chillers sized equally.
Service hot water pumps in the baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
I am doing an ASHRAE 90.1-2007 PRM analysis.
New & exisiting space and minimum requirements?
NC-2009 EAp2:Minimum Energy Performanceposted by Chris Miller on
I have a project that is an exisiting building renovation with an addition. I understand my energy model will be based on a combination of the new & existing.
WHAT IS DIFFERENCE NFRC 100 AND NFRC 200
NC-2009 EAp2:Minimum Energy Performanceposted by Ramkrishna Kashyap on
ONLY NON-RESIDENCE ALUMINUM FRAME
EA prereq documentation
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Decoster on
We have documented EA prereq 2. We are using LEED NC v 2009 and we are using form version 4. We have filled in all the required information with the exception of the Target Finder.