NC-2009 EAp2:Minimum Energy Performanceposted by Len Sciarra on
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and Exist
LEED v2009 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear Concern:- 1.Is the LEED v2009 Minimum Energy Performance Calculator sheet is mandatory for LEED 2009 project submission 2.what is the difference between Revised Section 1 4 Tables (Jan 201
DCV modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project I'm modeling has several DOA AHUs. Every AHU has a single CO2 sensor located on the return duct next to the unit.
90.1 Envelope Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Ruben Porter on
I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th
Water Heater efficiency per table 7.8 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello, As required by 7.4.2 Equipment Efficiency of ASHRAE 90.1-2007, for a water heater less than 12 kW and more that 20 gal, the required performance is EF=0.97-0.00132*V. My question is: is ther
is this clarification ok?
NC-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en
Big Ceiling Fan
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Long on
I have a job where there are several Big Ass Fans. My problem is in determining how to model them in the energy simulation.
District Thermal Energy and Single LEED project boundary
NC-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
The project comprises four hospital buildings, called B, C, D and E, and each building is registered as an individual project on a campus basis.
backup energy source
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD