ASHRAE 90.1 vs T-24 in california

NC-2009 EAp2:Minimum Energy Performance
posted by  Lance Collins  on 

Question: I am working on a new LEED-NC project in california that is using a modular/prefab construction type with mechanical systems that do not require permits via the T-24 code.

1
Tue Feb 8, 2011, 5:19 am

Chilled Water Pumps, Primary/Secondary

NC-2009 EAp2:Minimum Energy Performance
posted by  Aaron Dahlstrom  on 

ASHRAE 90.1-2007 Sec G3.1.3.10 requests that users specify pump power of 22 W/gpm, with a primary / secondary pumping system and variable flow on the secondary side.

1
Fri May 18, 2012, 3:43 pm

Conditioned Space

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

Consider a space, storage, with no heating, modelled with heating setpoint -50 degC, receives air from a central air handling unit VAV system, where the delivered air is pre-conditioned from Outdoo

1
Tue Feb 12, 2013, 3:46 pm

Parallel PIU fan energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Magda Aghababyan  on 

My baseline is under system 6 in which the parallel PIU fans has to be introduced for each zones.

1
Fri Jun 20, 2014, 2:39 pm

Separated Baselines for Residential and Non-residential Portions

NC-2009 EAp2:Minimum Energy Performance
posted by  Wenguang Wang  on 

We have a hotel development project in China seeking for the LEED-NC v2009 certification. We are now facing a problem of setting the baseline case for the energy model.

1
Wed Apr 13, 2011, 12:27 pm

ASHRAE 90.1 - Section 8 Voltage Drop

NC-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

In the section 8.4 Feeder conductors shall be sized for a maximum voltage drop of 2% at design loadand branch circuit condutors shall be sized for a maximum voltage drop of 3% at design load. I'm

1
Wed Jun 29, 2011, 3:18 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  Jane Long  on 

I'm modelling a European Industrial project where nearly a 5th of the floor area is a specialist process area, similar to a clean room or laboratory, however used for industrial processes, in use 2

1
Tue Aug 7, 2012, 1:39 pm

Modeling HVAC for future un-designed office space

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.

1
Fri Dec 9, 2016, 3:38 pm

Regional industrial practices

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.

1
Fri Apr 5, 2013, 3:56 pm

Old HVAC equipment transferred from other site

NC-2009 EAp2:Minimum Energy Performance
posted by  Yastimy Jupson  on 

Hello, I have a new factory project recently. The owner wants to transferred old HVAC equipment from their old factory to this new factory.

1
Tue Aug 26, 2014, 1:30 pm