Post a question or comment
Credit Filters
On-Site Renewable Energy
Filter by location
Forum
Topic
Replies
Recent
3
Thu May 31, 2018, 3:14 pm

PVs added after design submission

NC-2009 EAc2:On-Site Renewable Energy
posted by  Aliesa Adelman  on 

If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const

1
Mon Sep 19, 2011, 9:02 pm

EAc2 criteria of the biogas

NC-2009 EAc2:On-Site Renewable Energy
posted by  Marcello Polverino  on 

Hello, I need the criteria of biogas outside of United States (Germany). Are ther requirements? Thank you > Marcello

1
Wed Mar 13, 2013, 1:36 pm

Hello, regarding my previous

NC-2009 EAc2:On-Site Renewable Energy
posted by  Gabriele Polenta  on 

Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom

1
Wed Jan 8, 2014, 4:48 pm

Jute Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- In our project we have Jute boiler in our project with 2.0 Ton capacity This boiler utilizes the Jute scrap but the scrap is collect fro nearest jute making stations As per ID-10300

1
Fri Jun 24, 2016, 2:45 pm
0
1
Thu May 6, 2010, 7:30 pm

Renewable Energy Cost - Escalating Rate

NC-2009 EAc2:On-Site Renewable Energy
posted by  Timothy Casper  on 

Our project has a PV array which is leased by the building owner under a 20-year power purchase agreement. However, the agreed upon rate increases 2% each year during these 20 years.

1
Fri Jun 21, 2013, 5:39 pm

Campus project (Master site) with 4 buildings

NC-2009 EAc2:On-Site Renewable Energy
posted by  Peg Manuel  on 

We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.

1
Wed Dec 23, 2015, 2:31 pm