IEQ Prerequisite 1 Form - reoccuring error
NC-2009 IEQp1:Minimum IAQ Performanceposted by Kenneth Ruby on
IEQ Prerequisite 1 Form: I have a reoccurring error on my mechanical ventilation – Multiple Zone Chart that is reading “Would need over 100% OA Intake”.
Critical zone
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
IEQp1 form v06 has a new requirement to describe "how critical zones are selected and how all occupiable zones are accounted for in the determination of the critical zone.
Industrial Plant Manufacturing Hall Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sustainability Provider on
We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices.
Fresh air fan model
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sivarajah Ragulakeethan on
Hi We are working on a Data center LEED project. Do we need to model the fresh air fan for server room area because there were already exhaust fan and fire suppression system?
Complying with Natural Ventilation Req. in a Apartment Bldg.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rob Hink on
We have a multi unit high rise residential bldg. and we are attempting to provide natural ventilation to all units using the operable windows and sliding doors.
Engineered ventilation rates
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEEDme Lorenzi on
We are working on a office building in which there is an openspace. The outside openings largely cover 4% of the total floor area.
Ventilation in residential portion of mixed use project
NC-2009 IEQp1:Minimum IAQ Performanceposted by David Sheridan on
My client is developing apartments over first floor retail in an old building in the central business district.
Fan Coil Unit
NC-2009 IEQp1:Minimum IAQ Performanceposted by FARIZAN DAVEZAC on
Hi, We have a project served by FCU connected to existing chiller - we do not have AHU.
Low System Ventilation Efffiency for Corridors
NC-2009 IEQp1:Minimum IAQ Performanceposted by Todd Tewksbury on
Hi, I am conducting a ventilation calculation for the an office building that consists of open office space, conference rooms, corridors, etc.