Forum quick links
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.
Naturally Ventilated Corridors
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Matthew Macko on
Do corridors need to have access to operable windows within 25 feet?
IEQ p1 options
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ramon Gomez on
Hi, we are filling the form for the IEQp1 and we have a doubt on what to choose between mechanically ventilated or mechanically conditioned, since we consider our areas mech.
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello all, I am completing the 62mzcalc spreadsheet during heating mode. VAV box minimums are typically 30% for systems with reheat.
EBOM Project Occupancy Doubt
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev
Exhaust System test for pressurized buildings with no exhaust
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
Hi all, We have an existing building built in the early 1900s with three 100% make up air units supplying fresh air with no exhaust.
How to justify Er variables
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Tam Kin Hung on
The project is using VAV system and the total supply to each zone (Vdzd) accounts for both primary air and local recirculated air.
VRP calculations for fan-powered boxes using 62MZ calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by tiantian zhou on
Our system has fan-powered VAV boxes. The first review comments required us to use 62MZ calc to account for local recirculation. But we have 120 AHUs and hundreds of zones.
10 cfm per person rule
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Jay Murray on
I have a small tenant space in a large high rise commercial building.