1
Mon Nov 8, 2010, 3:36 pm

Detailed Plant Simulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Hi, we have a project with a certain number of 'back up' systems for air conditioning.

1
Tue Jul 3, 2012, 6:37 pm

active control for private offices

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mark Taake  on 

I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s

1
Wed Jan 16, 2013, 8:03 pm

Datacentre Requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Priyadarsi Das  on 

Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.

1
Wed Feb 11, 2015, 11:34 pm

EAc1.3

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Dipti Talwar  on 

Hi, I have couple of queries regarding EAc1.3 Option 1- Equipment efficiency 1.We are doing a interior fit out project (LEED CI), in which the complete building (100%) will be leased to a single

1
Mon Apr 25, 2016, 6:48 pm

Critical Path Supply Duct Pressure Drop Calculations

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bryan Lanier  on 

Currently working on a tenant project. Base building chilled water to each floor supplying DOAS Terminal Units. I'm planning on supplying PD calcs for representative units.

1
Fri Mar 10, 2017, 6:14 pm

Option 2: Scope and EAp2

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Marco Abdallah  on 

1) Is it possible to pursue option 2 even if all the central HVAC systems are not part of the tenant scope of work? 2) Is it possible to use the simulation (option 2) according Ashrae Appendix G al

0

Showing Prescriptive Compliance for CRAC units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Christie Rimes  on 

The CI project I am working on uses a CRAC unit and I was uncertain, which category CRAC units come under. If it is classified as Packaged Unitary Equipment then it needs to show compliance with E

1
Mon Nov 2, 2015, 2:15 pm

LEED Retail CI EAc1.3 zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Francisco Aguirre  on 

Hi, I am working on a retail project with a VAV system where zoning is performed by variable dampers controlled by thermal sensors in each different thermal zone.