EAp2 Required Signatories
NC-2009 EAp2:Minimum Energy Performanceposted by Bob Korp on
Two project engineers have completed the sign-off task, but a 3rd has been unable to use LEED ON-LINE despite my efforts to provide remote assistance.
Square Footage Discrepancy
Schools-2009 EAp2:Minimum Energy Performanceposted by Michael Kros on
Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model
MR3 or MR1.2?
CI-2009 MRc3.1:Materials Reuseposted by Kenny Grossman on
I've got a project where nearly nothing has changed between tenants.
How do I find replacement lights?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Michael Smithing on
I've been provided with a light inventory for our building and so know what type of light I'm looking for (e.g. 18W F840). I've also found the Philips, GE and Sylvania LEED-EB calculators.
Treatment plant startup
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Gabriela Hernández Castillo on
Due to the nature of a treatment plant it requires the building to be operating before the treatment plant is functional. Is there any requirement for a maximum of time before the treatment plant
EPEAT?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by American University on
I see where EPEAT is listed as a resource in the LEED guide but where in the guidance does it say that EPEAT-rated electronics comply with the sustainable purchasing criteria?
IEQ Innovation Credit
NC-2009 IEQp1:Minimum IAQ Performanceposted by Martin Dettling on
Is it safe to say that if a project acjhieves 60% improvement over ASHRAE 62.1 outdoor air ventilation rate that the project would be likely to receive an innovation credit if applied for?
LPD for space types not listed on ASHRAE Table
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
Does anyone know how the baseline Lighting Power Density should be set up if the space type is not listed on Table 9.6.1 of ASHRAE 90.1 using Space-by-space method?
Option 2 - RECs purchasing
CI-2009 EAc4:Green Powerposted by Juliana Malho on
I´m trying to set how many RECs I must buy to comply with this credit for a project of 59,545sqf.
Flush Out in Stages
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nell Achtmeyer on
I am wondering if it's possible to sequence the flush out in stages so that you can make your way through the building, but also maintain work in other parts as well...