Forum quick links
MockUp ID Credit
NC-2009 IDc1:Innovation in Designposted by Dan Forino on
Has anyone attempted the MockUp ID credit for a Commercial (instead of Residential) project?
Corrective Action - Sound Privacy
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by AshLee Eustace on
We just completed the occupant survey, and the results are showing that many of the occupants are dissatisifed with the sound privacy.
RE: IEQ.p1- 62 MZ-ASHRAE Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
I have a 3 story non-residential building, and VAV's on each floor are served by individual air handling units.
Walking closets?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Agustina Galli on
Hi everyone! we are building a Hotel and Residences and are willing to certify as New Construction.
COP - Future tenants - Energy Efficiency Simulation
CS-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.
Baseline Building System
CS-2009 EAp2:Minimum Energy Performanceposted by Dave Madsen on
I understand the selection of the base building systems (number of floors, sf, etc.) My question is, if the packaged RTU's are gas fired heat, but the fan powered VAV boxes (in the proposed design
How to calculate the area for SSc5.1
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Felipe Duran on
Hallo, I have a question how to calculate following areas: 1.
Recycling in Multi-family housing project
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Kenneth Van Riper on
Based on review of CIRs and the comments on this forum I think our approach to this prerequisite would be acceptable, but I thought I'd see if anyone else out there wanted to weigh in.
MRc7 New wood %
CI-2009 MRc7:Certified Woodposted by Judy Chin on
I rec'd an invoice for a wood product stating that the product is FSC Mixed Credit, LEED Online is asking for new wood % for this product.Supplier can not provide me with % info, what should i do.
Green Power Purchasing
CS-2009 EAc6:Green Powerposted by Jesus Deras on
When purchasing Green Power for commercial interior fit outs/Floor via the SF methodology, do you typically take the area of the entire space(including ac rooms, freight elevators, stairs,electrica