Building Occupancy for Performance Period
EBOM-2009 EAc1:Optimize Energy Performanceposted by Galen Staengl on
Is there a minimum building occupancy % for the 12 month performance period? I am working on an office tower that has slowly increased it occupancy over the last year.
BDC Material Calculator with values over $1,000,000
NC-2009 MRc5:Regional Materialsposted by Julie Blue on
Has anyone run into an issue with the calculator not showing the "Sustainable Criteria Value ($)" under the Regional Materials for total material values over $1,000,000?
Dormitory and Car/Van Pool Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Andrew Lengel on
We are renovating the interiors of two existing dormitories on a college campus. Per LEED-CI SSc3.3 we fall under Case 2. We are not providing any new parking.
Can Interior vegetated areas in the ground floor be counted?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Sonia M. Miranda Palacios on
I´m working in a Project in Buenos Aires, Argentina, that is trying to achieve SSc5.1.
New Calculation Spreadsheet
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Yelena Gipsov on
Hello! I am working with the new Supplemental Daylight and Views Calculation Spreadsheet, prescriptive option. There is a column "Glare Control Type for spaces with VLT X WFR > 0.18".
hi
The project we´re working
CS-2009 EAc4:Enhanced Refrigerant Management
posted by Ismael Arroyo on
hi The project we´re working on will be cooled by coolling towers, so the tenants can have cooled water to install their own HVAC system.
Baseline HVAC System for laboratory
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual: 1. For laboratory spaces with a min.
No pesticides used during performance period
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Matthew Macko on
We are currently working on a project that used no pesticides during the performance period.
Path 6: Liscenced Professional Exemptions
CI-2009 SSc1:Site Selectionposted by Kara Hermann on
For path 6, Light pollution reduction, there used to be a "Streamlined Path (LPE)" - but I cannot find this option on the form. Does anyone know if this got taken away as an option?
PARKING BUILDING
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by LEED Pro Consultant on
Hello, I'm working on a project where 90% of the building (3 storeys high, 529 parking spaces) is a parking lot that covers the needs of different buildings next to it and 10% is a community centr