Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Hotel project has public parking space

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  J.W. Shin  on 

Hotel project has total 287 parking spaces (35 for Hotel, 252 for Public). and maximum local parking space limit is 85 for Hotel. There is no any requirements for Public parking.

1
Tue Nov 6, 2012, 11:11 pm

Individual Workstation Lighting Controls

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathy Trejo  on 

The individual workstation lighting controls section has changed with the version 4 form. We now must enter each space and provide documentation of each control for task lighting.

1
Sun Nov 25, 2012, 6:01 pm

Cistern volume

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Lucie Cervena  on 

I work on the project where it is impossible to design non-structural measures because soil can´t infiltrate almost any water.

1
Wed Nov 7, 2012, 12:19 pm

Universal Design Features - Mid Rise

Pilot-Credits PC34:Design for Adaptability
posted by  Jennifer Palermo  on 

Richardson Lofts is an adaptive reuse of what was a 6 story jewelry factory built circa 1900 in downtown Newark, NJ, and turned into 67 loft dwelling units.

0

carpet tile approved as walk-off mat

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

0

Carpet tile approved as acceptable walk-off mat

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

0

Energy modeling - ASHRAE §G3.1.2.4

NC-2009 EAp2:Minimum Energy Performance
posted by  Julien Daclin  on 

Hi all, We are undertaking the energy modeling of an office building and the Baseline is using a System 7, climatic zone is 4a.

1
Wed Nov 7, 2012, 4:16 pm

Plumbing & electrical out buildings and Space Usage table

NC-2009 PIf3:Occupant and Usage Data
posted by  Erin Holdenried  on 

I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.

1
Tue Nov 6, 2012, 11:46 pm

MPR6

Retail-NC-v2009 EAc5:Measurement and verification
posted by  Ward Miller  on 

Has anyone tried earning 1 point for MPR 6 on this credit as is available in other rating systems?

1
Fri Nov 23, 2012, 1:37 am

Building Density Clarification

CS-2009 SSc2:Development Density and Community Connectivity
posted by  James Wieben  on 

The sample calculations in the Tool Kit example all have a building on the property. My real life example has some areas with surface parking and no building.

1
Sun Nov 25, 2012, 12:56 am