Hotel project has public parking space
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by J.W. Shin on
Hotel project has total 287 parking spaces (35 for Hotel, 252 for Public). and maximum local parking space limit is 85 for Hotel. There is no any requirements for Public parking.
Individual Workstation Lighting Controls
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathy Trejo on
The individual workstation lighting controls section has changed with the version 4 form. We now must enter each space and provide documentation of each control for task lighting.
Cistern volume
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lucie Cervena on
I work on the project where it is impossible to design non-structural measures because soil can´t infiltrate almost any water.
Universal Design Features - Mid Rise
Pilot-Credits PC34:Design for Adaptabilityposted by Jennifer Palermo on
Richardson Lofts is an adaptive reuse of what was a 6 story jewelry factory built circa 1900 in downtown Newark, NJ, and turned into 67 loft dwelling units.
carpet tile approved as walk-off mat
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Melissa Vernon on
Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w
Carpet tile approved as acceptable walk-off mat
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Melissa Vernon on
Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w
Energy modeling - ASHRAE §G3.1.2.4
NC-2009 EAp2:Minimum Energy Performanceposted by Julien Daclin on
Hi all, We are undertaking the energy modeling of an office building and the Baseline is using a System 7, climatic zone is 4a.
Plumbing & electrical out buildings and Space Usage table
NC-2009 PIf3:Occupant and Usage Dataposted by Erin Holdenried on
I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.
MPR6
Retail-NC-v2009 EAc5:Measurement and verificationposted by Ward Miller on
Has anyone tried earning 1 point for MPR 6 on this credit as is available in other rating systems?
Building Density Clarification
CS-2009 SSc2:Development Density and Community Connectivityposted by James Wieben on
The sample calculations in the Tool Kit example all have a building on the property. My real life example has some areas with surface parking and no building.