Defining 'one building'

NC-2009 PIf1:Minimum Program Requirements
posted by  Erin Holdenried  on 

I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?

1
Wed Nov 7, 2012, 3:03 pm

Active ingredient

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Katherine Ann Resurreccion  on 

Hi All, Our client uses pesticides/chemicals in their facility, some are those that are commercially available or sold for household use, however the active ingredient is not present on the SF haz

1
Mon Nov 12, 2012, 3:48 pm

WEc1 Option 2 Path 1

NC-2009 WEc1:Water Efficient Landscaping
posted by  Don Hardwick  on 

Hi, I have a project planning to use 100% non- potable water for irrigation.They are planning on doing this through collecting rain water.

1
Wed Nov 21, 2012, 9:12 pm

UnmetLoadHours - Do we have clarity yet?

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?

1
Fri Nov 9, 2012, 8:17 pm

Option 1 - is a residential element required?

CI-2009 SSc2:Development Density and Community Connectivity
posted by  R Jones  on 

If a project is pursuing option 1 development density calculations must there be a residential element recorded within the 60,000sf/acre figure? thank you

1
Sun Nov 25, 2012, 12:26 am

E -waste goes back to manufacturer

EBOM-2009 MRc8:Solid Waste Management—Durable Goods
posted by  Anna Korinkova  on 

Our building has a large number of tenants with separate management. Their IT equipment go back to the manufacturer and do not go to the building main waste stream.

1
Wed Nov 7, 2012, 4:34 pm

auto-shutoff faucets

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jonathan Weiss  on 

I am sure this has been answered elsewhere in this listing but I am confused by the back and forth about auto-shutoff faucets, the most common commercial lavatory faucet in much of the work I am in

1
Wed Nov 7, 2012, 4:47 pm

Brewery Process Load - Baseline and Proposed Case Set-up

NC-2009 EAp2:Minimum Energy Performance
posted by  Xun Jia  on 

The brewery I am modeling has large percentage of energy consumption associated with the process load.

1
Wed Nov 7, 2012, 10:58 pm

preserved for the life of the building?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Erin Holdenried  on 

Is it required that habitat area be preserved for the life of the building (like open space in SSc5.2). The credit does not specfy this requirement.

1
Fri Nov 23, 2012, 4:27 am

Baseline Lighting Power density

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

Hi, Can you help with the following two issues: 1.I understand proposed total installed lighitng power has to be the same in the energy model and in SSc8.