1/2 mile distance to basic services..
NC-2009 SSc2:Development Density and Community Connectivityposted by Hanne Goa on
Our project is located within 1/2 mile radius of more than 10 basic services. There is pedestrian access between the building and the services.
HAP boiler input data
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
is estimated max load reported in HAP boiler input data for baseline case same to that of total heating capacity reported in Table 1.4 HVAC (water side) for baseline???. In one of the project Est
Manufacturing facility: heat recovery and cooling of compressors
NC-2009 EAc1:Optimize Energy Performanceposted by Johannes Gellrich on
Dear all, I have a large manufacturing facility with an associated office wing, on which I would like to discuss two things: 1.
Unknown CFM into spaces
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Sonrisa Lucero on
We are using the 62MZ Calculator spreadsheet for an office building. The HVAC system does not utilize VAV boxes or any kind of terminal unit. Rather, it just feeds directly into each space.
Measuring the landscaped area
NC-2009 WEc1:Water Efficient Landscapingposted by Alicia Villanueva on
We are trying to reach the 5% landscaped area in a project. The question is: how do we measure it? The shaded area or the tree well area? Thank you!
Irrigation by hose
NC-2009 WEc1:Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on
Hi, my project will use non-potable irrigation by hose, but the template of LEED online don't show this option. How can I calculate the efficiency of this method? Thanks in advance
Compliance for SS CR 3 & IEQ CR 3.6
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by ABHIJIT PISAL on
Our client uses pesticides/chemicals which are allowed to use in India as per local regulation.
Fire Stopping Sealants
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Mariah Grife on
I am currently tracking the LEED Data for a construction project I am on.
street network
Pilot-Credits PC9:Street Networkposted by Sara Aschliman on
It appears that our project will qualify for this point, and I do believe that the spirit of the credit positively reinforces the walkability of our neighborhood site as the increased intersections
MPR 6 - Energy Star Portfolio Manager not for future buildings?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Cassandra Kail on
I am currently working on a LEED-NC 2009 Multiple Building Project. We are having a problem with MPR 6; commit to showing whole-building energy and water use data.