4.3 effic vehicle parking versus 4.4 car pool parking

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Noriko Nagazumi  on 

Hi, In a project where preferred parking are the parking spaces closest to the main entrance, is there any order when SSc4.3 placing low emitting and fuel efficient vehicles preferred parking and

1
Tue Jul 9, 2013, 5:04 pm

Industrial zones

NC-2009 SSc1:Site Selection
posted by  Emre Yöntem  on 

Hi all, Is there any exception for the areas divided for particular activity like industrial zones? Are these areas also undeveloped? Thanks in advance.

1
Sun Nov 3, 2013, 3:36 am

CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Jamal Uddin  on 

If the task of CxA complete in design phase now for my building but the building construction will be finished totally after 4/5 years from now.

1
Wed Jul 17, 2013, 3:09 pm

Determining the Owner/Tenant % Controlled for ACP

CS-2009 EAc1:Optimize Energy Performance
posted by  Joseph Petty  on 

I have a C&S medical office building that is 88% tenant space (by area) and am trying to figure out how to correctly document the owner/tenant % of the building energy cost for the Core and She

1
Thu May 30, 2013, 2:36 pm

Autocontrol / metering urinals - 12sec or optional?

CS-2009 WEc3:Water Use Reduction
posted by  Petr Vogel  on 

Dear all, when calculating proposed case water consumption budget for public autocontrol / metering urinals…is there the same requirement like the 12sec requirement for public autocontrol / meteri

1
Mon Nov 4, 2013, 7:08 pm

Combination of Test and Flush

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michael McVinney  on 

On a hangar project, there is a conditioned Admin space and an unconditioned Hangar space.

1
Thu May 30, 2013, 6:11 am

Major Renovation vs. New Construction

NC-2009 EAp2:Minimum Energy Performance
posted by  MT A  on 

We are working on a library project that involves the renovation of an existing facility, and the addition of a new wing.

1
Wed May 29, 2013, 1:56 pm

Pilot credit 10

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Alicia Villanueva  on 

Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 40%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand

0

Building Footprint

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Marcela Larrain  on 

In our Project we have an underground floor with retail program that has a larger projection that the ground floor which is also retail.

1
Mon Nov 4, 2013, 6:41 pm

New vs. Recycled Wood

CI-2009 MRc7:Certified Wood
posted by  Kevin Dunham  on 

Is paint-grade molding (made from short pieces finger-jointed together to form a usable length) considered new wood or recycled wood (presumably 100% pre-consumer)?

1
Wed May 29, 2013, 11:05 pm