Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option #3 is added to EAc5 M&V

NC-2009 EAc5:Measurement and Verification
posted by  Genko Ganev  on 

I would like to find out what are the requirements for achieving EAc5 - Option #3? Where can I find information to read on MPR #6? and What is :" Option 1 in Pl Form1? Thank you very much

1
Fri Jun 28, 2013, 6:02 pm

Fresh air from different AHUs for the same room

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Shadi Sobh  on 

hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre

1
Wed Jul 10, 2013, 2:25 pm

Comprehensive waste reduction program

NC-2009 IDc1:Innovation in Design
posted by  Magda Aghababyan  on 

If a manufacturing plant decides to do a comprehensive waste stream audit for its entire manufacturing process and implement a waste reduction plan will it be considered as an innovation credit? T

1
Mon Jul 1, 2013, 3:55 am

Stormwater to public rainwater channel that is connected to sea

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Lise Dannesboe  on 

Our building is connected to a public rainwater channel which is placed out of the LEED boundary, the rainwater channel is connected to the sea.

1
Mon Jul 1, 2013, 4:45 pm

Defining "Footprint" when the Building is on a slope

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Amit Ahiel  on 

Our project is on a sloped site so the main entry (we call it "ground floor") in above another entry point where part of the building is embedded in the earth.

1
Sun Nov 3, 2013, 2:46 am

Warehouse -

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Devani PERERA  on 

Hi, I am working on a warehouse project.

1
Tue Jul 2, 2013, 1:39 am

MPR #6 modification

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Ron Dean  on 

Hello, I've seen in leedonline for a recently registered project I'm working on that this form (PIf1) has been updated from version 4.0 to 5.0.

1
Tue Nov 5, 2013, 1:57 pm

Measurements

Pilot-Credits EQpc24:Acoustics
posted by  Anulak Siwabut  on 

I don't see specified in the documentation the extent of measurements required in order to meet this credit.

1
Mon Nov 25, 2013, 6:13 pm

Manufacturer specs required or are nameplates sufficient?

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Alice Cook  on 

Are you required to provide the manufacturer's specifications, or is it enough to upload the nameplates to LEED?

1
Sun Sep 8, 2013, 5:53 pm

Access to Public Spaces

Pilot-Credits PC14:Walkable Streets
posted by  Jennifer Preston  on 

Is there a requirement or guideline as to how far from the project site the public spaces/squares/plazas need to be?

0