Option #3 is added to EAc5 M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
I would like to find out what are the requirements for achieving EAc5 - Option #3? Where can I find information to read on MPR #6? and What is :" Option 1 in Pl Form1? Thank you very much
Fresh air from different AHUs for the same room
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Shadi Sobh on
hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre
Comprehensive waste reduction program
NC-2009 IDc1:Innovation in Designposted by Magda Aghababyan on
If a manufacturing plant decides to do a comprehensive waste stream audit for its entire manufacturing process and implement a waste reduction plan will it be considered as an innovation credit? T
Stormwater to public rainwater channel that is connected to sea
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lise Dannesboe on
Our building is connected to a public rainwater channel which is placed out of the LEED boundary, the rainwater channel is connected to the sea.
Defining "Footprint" when the Building is on a slope
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Amit Ahiel on
Our project is on a sloped site so the main entry (we call it "ground floor") in above another entry point where part of the building is embedded in the earth.
Warehouse -
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Devani PERERA on
Hi, I am working on a warehouse project.
MPR #6 modification
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ron Dean on
Hello, I've seen in leedonline for a recently registered project I'm working on that this form (PIf1) has been updated from version 4.0 to 5.0.
Measurements
Pilot-Credits EQpc24:Acousticsposted by Anulak Siwabut on
I don't see specified in the documentation the extent of measurements required in order to meet this credit.
Manufacturer specs required or are nameplates sufficient?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Alice Cook on
Are you required to provide the manufacturer's specifications, or is it enough to upload the nameplates to LEED?
Access to Public Spaces
Pilot-Credits PC14:Walkable Streetsposted by Jennifer Preston on
Is there a requirement or guideline as to how far from the project site the public spaces/squares/plazas need to be?