CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?
Construction Submittal
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jennifer Benedict on
Is there any additional items that are required during the construction submittal?
Simultaneity factor flushing of toilets and landscape
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lise Dannesboe on
Hej! We are integrating a water tank in our project to supply the toilets with rainwater and to supply landscaping with water.
What was your LEED deliverable after the site assessment?
Healthcare-v2009 SSp2:Environmental site assessmentposted by Jill DeMarotta on
What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-
Conditioned vs. unconditioned & natural ventilation
NC-2009 EAc1:Optimize Energy Performanceposted by SmithGroup BG+LU FW on
Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.
Option 2 - portion of residential street meets 10 units per acre
NC-2009 SSc2:Development Density and Community Connectivityposted by Jay DeVilbiss on
Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.
dorm bike storage
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Brian Wolfe on
Is it acceptable to pursue bike storage on the premise that the secured, covered storage is the dorm/apartment.
pre-rinse spray faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Sheryl Swartzle on
Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?
Do you submit form during Design or Construction Review phase?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nicole Kimoto on
For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?
PIf2: square footage of all parking areas
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
Does anyone know if the 'square footage of all parking areas' includes the drives as well, or is it only the parking stalls themselves?