Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Core landlord space

NC-2009 PIf2:Project Summary Details
posted by  Mike D  on 

A potential CI project has a core in the middle of the space, which is not part of the project but belongs to the landlord. No work will be done there.

1
Fri Sep 20, 2013, 3:51 pm

LEED CI Retail withour glass wall in the mall

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jatuwat Varodompun  on 

Can the retail shop in the large shoping mall (conditioned) without the glass enclosed door and wall (the space is connect to the conditioned corridor+atrium) pursue LEED-CI retail? If yes, what s

1
Tue Nov 5, 2013, 3:48 pm

Can I contribute cork to multiple credits (MRc4 and MRc6)?

Schools-2009 MRc6:Rapidly Renewable Materials
posted by  Ricardo Sá  on 

If my cork product has recycled content and rapidly renewable, can I use it to contribute for both of them?

1
Wed Sep 18, 2013, 5:38 pm

Equipment not certified by AHRI but with the same efficicency

NC-2009 EAp2:Minimum Energy Performance
posted by  jorge calderon  on 

In the plase of construction i have an HVAC equipment not certified by AHRI.

1
Wed Sep 18, 2013, 6:22 pm

Prescriptive EnergyEfficiency nApproach

NC-2009 EAc1:Optimize Energy Performance
posted by  J.R. Anderson  on 

The LEED 2009 v does not specify the level of efficiency for a small office / mixed use building. Only AEDG 2004 is shown specified.

1
Wed Sep 18, 2013, 6:26 pm

Stairwells in APPA audit? And mechanical rooms?

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Helen Samuel  on 

I am looking for guidance on how to count stairwells in the APPA Custodial audit. We have 3 stairwells, and 10 floors. Case A: Does each stairwell count as a single "room"?

1
Mon Sep 23, 2013, 12:01 pm

Building a Library next to a School

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Krysta Dimick  on 

Can a school bus line count as our additional transportation line?

1
Wed Sep 18, 2013, 9:15 pm

Pergola covering the mechanical equipment

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Alicja Bieszyńska  on 

The mechanical equipment located on the roof of my project is covered by a metal pergola/blinds only for the esthetics.

1
Mon Sep 30, 2013, 6:31 pm

High Rise Building with 120+ AHUs

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Mark Daub  on 

Hi, Im working on a project in Germany that consists of two high rise buildings with 30 floors each. Each floor is devided into 2 Zones.

1
Tue Oct 15, 2013, 7:14 pm

Compliance for the horizontal view at 42”

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Aditya Chemburkar  on 

For a CS Project, the tentative floor layout for the office space has been designed.

1
Thu Sep 19, 2013, 1:53 pm