Forum quick links
MRI room speciality construction
CI-2009 MRc7:Certified Woodposted by Susan Di Giulio on
Hi, We are working on a medical research facility that has copper-lined MRI rooms.
Products listing 0% Volatiles
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Susan Di Giulio on
Hi, We don't have any chemists here but we were wondering if, when an MSDS lists Volatiles = 0%, but does not list VOCs in g/L formt, can we assume that VOCs=0 as well?
Parking under the building but not belonging to the same owner
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mark Frey on
Hi, We are working on a new construction of an office building located on a site where 3 other buildings will be also constructed.
Parking under the building but not belonging to the same owner
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Mark Frey on
Hi, We are working on a new construction of an office building located on a site where 3 other buildings will be also constructed.
Low-Emitting and Fuel-Efficient Bus and Maintenance Fleet
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gail Vittori on
We are having trouble assessing the efficiency and emissions for a school bus and maintenance fleet.
captured rainwater
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Emmanuel Pauwels on
We have tried to comply by using 100% captured rainwater for flush fixtures.
sample BAS docs
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Tristan Roberts on
Thanks to David Hubka, LEEDuser has added two sample documents to our Toolkit for this credit—a BAS summary report, and a preventive maintenance checklist.
Option 2 Percentile Rainfall Event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jason Cocek on
I am trying to document a project under option 2 for this credit for a zero lot line project. Does anyone know what objective data compliance for this option is based on?
lighting requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
And one more thing just to be sure: Does the project need to comply with lighting power allowance requirements of sections 9.5 or 9.6 (ASHRAE 90.1-2007)?
LEED Green Associate
NC-2009 IDc2:LEED Accredited Professionalposted by Dennis Comis on
Does the Green Associate level qualify for the 1 Point Idc2 ?