Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Louvers for Fresh Air intake

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Nandana Kumar  on 

Hi, For one of the LEED CI project, the developer has provided louvers with motorized dampers in the AHU for fresh air intake. Can the louvers qualify for fresh air intake?

1
Fri Jul 18, 2014, 1:29 am

Must be electricity for FCUs ventilators measured?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Frantisek Macholda  on 

Hello, we have CS office project. The main HVAC systems are central, there are only fan-coils and small local water heaters in tenant spaces.

0

Accessories Included in Baseline.

Healthcare-v2009 WEp1:Water use reduction
posted by  Gabriela Crespo  on 

Dear Forum, I have a question regarding which accessories I should include in the baseline for this credit for a Hospital. Are the faucets located in the surgical prep area included?

1
Mon Jul 21, 2014, 5:30 pm

Healthcare vs NC - Fundamental Commissioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Saju Varghese  on 

Hello, I'm looking into the difference between Healthcare and New Construction Fundamental Commissioning for a project but I have not been able to find anything related to that.

1
Sat Apr 26, 2014, 2:20 pm

CI or NC:MR

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Alan Viale  on 

I present a case to confirm the selection of certification must have a project. In a lot of 3900sqf there is a two-storey house with a total area of 4500sqf built on an area which over the years h

1
Tue Jun 17, 2014, 10:02 pm

Shoe removal and storage space in place of walk off mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats.

0

Employee only restrooms/ no public restrooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Sheela I  on 

In a small retail scenario if there is one unisex restroom intended for employee use only how to you deal with the transient visitors to the space in the PI form?

1
Mon Apr 28, 2014, 5:33 pm

Energy Auditor requirements

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Omar Delgado  on 

Are there any specific requisites for the person performing the energy audit (certifications, experience, etc.)?

1
Fri Apr 25, 2014, 4:45 pm

Reuse of process equipment

NC-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

Hello everyone, We are working on an industrial facility project, in this case the process loads represent a 60-70% aprox. The intent of the client is to bring equipment from another plant and r

1
Sat Apr 26, 2014, 12:18 am

LEED --NC 2009 Summitals platmatel EA credit 1

NC-2009 EAc1:Optimize Energy Performance
posted by  Yu Tang c850802@ms10.hinet.net  on 

Hello,Anyone : Who can help me where can find LEED --NC 2009 Summitals platmatel EA credit 1 Thanks and best regards, Y.T.

1
Sun Apr 27, 2014, 6:43 pm