Forum quick links
Louvers for Fresh Air intake
CI-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, For one of the LEED CI project, the developer has provided louvers with motorized dampers in the AHU for fresh air intake. Can the louvers qualify for fresh air intake?
Must be electricity for FCUs ventilators measured?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Frantisek Macholda on
Hello, we have CS office project. The main HVAC systems are central, there are only fan-coils and small local water heaters in tenant spaces.
Accessories Included in Baseline.
Healthcare-v2009 WEp1:Water use reductionposted by Gabriela Crespo on
Dear Forum, I have a question regarding which accessories I should include in the baseline for this credit for a Hospital. Are the faucets located in the surgical prep area included?
Healthcare vs NC - Fundamental Commissioning
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
Hello, I'm looking into the difference between Healthcare and New Construction Fundamental Commissioning for a project but I have not been able to find anything related to that.
CI or NC:MR
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alan Viale on
I present a case to confirm the selection of certification must have a project. In a lot of 3900sqf there is a two-storey house with a total area of 4500sqf built on an area which over the years h
Shoe removal and storage space in place of walk off mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats.
Employee only restrooms/ no public restrooms
Retail-CI-v2009 WEc1:Water use reductionposted by Sheela I on
In a small retail scenario if there is one unisex restroom intended for employee use only how to you deal with the transient visitors to the space in the PI form?
Energy Auditor requirements
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Omar Delgado on
Are there any specific requisites for the person performing the energy audit (certifications, experience, etc.)?
Reuse of process equipment
NC-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello everyone, We are working on an industrial facility project, in this case the process loads represent a 60-70% aprox. The intent of the client is to bring equipment from another plant and r
LEED --NC 2009 Summitals platmatel EA credit 1
NC-2009 EAc1:Optimize Energy Performanceposted by Yu Tang c850802@ms10.hinet.net on
Hello,Anyone : Who can help me where can find LEED --NC 2009 Summitals platmatel EA credit 1 Thanks and best regards, Y.T.