Commercial kitchen handwashing
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jatuwat Varodompun on
In a restaurant, we have a foot padel hand washing for food preparation of restaurant staffs. Does it require to include this equipment in the calculation by using baseline of 0.5 gpm?
Query Regarding use of Treated RO reject water from ETP for WEP1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ashwin Kumar on
We plan to use RO Reject Water which is generated from within the LEED project Boundary for a Factory Project (registered within a Master Site Campus) towards the Flushing requirement. As mentioned
In which construction phase can I certify my building?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Hazem Yusuf on
Construction phase of an office building is consisting of multi stages.
Process Loads in LEEDOnline Form
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I need to know if anyone did experience that before.
rigole system/french drain
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Doreen Kruschina on
Hi, we are implementing a `Rigole´ for TSS removal. Translators dish out `french drain´ for what i would describe as a bioswale with additional storage capacity due to gravel packages or the alike.
Verification of pressure difference
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Francisco Aguirre on
Hi all, We are developing a NC Campus project located in the Arab Gulf.
Cellulose Insulation and CA 01350
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Allison Zuchman on
I have found manufacturer documentation for all materials on a school project required to meet IEQ4.6 except for one product, a cellulose insulation (ICC Celbar).
Table EAp2-5
NC-2009 EAp2:Minimum Energy Performanceposted by Isabel Santos on
Dear all, I am having one difficulty in filling the form of EAp2.
Tenant's Project Scope
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sunayana Jain on
I have a small office fit-out which is served by a 5 RTUs exclusively. In the tenant's scope of work is only the ductwork and lighting with lighting controls.
SSc9.2 Defining "Direct Exterior Access"
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by Daniel Herstine on
We have patient courtyards that serve four (4) patient units each.