Recent

Commercial kitchen handwashing

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jatuwat Varodompun  on 

In a restaurant, we have a foot padel hand washing for food preparation of restaurant staffs. Does it require to include this equipment in the calculation by using baseline of 0.5 gpm?

1
Fri Jul 18, 2014, 3:06 am

Query Regarding use of Treated RO reject water from ETP for WEP1

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ashwin Kumar  on 

We plan to use RO Reject Water which is generated from within the LEED project Boundary for a Factory Project (registered within a Master Site Campus) towards the Flushing requirement. As mentioned

1
Sat Jul 26, 2014, 11:19 am

In which construction phase can I certify my building?

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Hazem Yusuf  on 

Construction phase of an office building is consisting of multi stages.

1
Fri Nov 27, 2015, 10:06 pm

Process Loads in LEEDOnline Form

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear all, I need to know if anyone did experience that before.

1
Mon May 5, 2014, 3:10 pm

rigole system/french drain

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Doreen Kruschina  on 

Hi, we are implementing a `Rigole´ for TSS removal. Translators dish out `french drain´ for what i would describe as a bioswale with additional storage capacity due to gravel packages or the alike.

1
Mon May 5, 2014, 2:15 pm

Verification of pressure difference

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Francisco Aguirre  on 

Hi all, We are developing a NC Campus project located in the Arab Gulf.

0

Cellulose Insulation and CA 01350

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Allison Zuchman  on 

I have found manufacturer documentation for all materials on a school project required to meet IEQ4.6 except for one product, a cellulose insulation (ICC Celbar).

0

Table EAp2-5

NC-2009 EAp2:Minimum Energy Performance
posted by  Isabel Santos  on 

Dear all, I am having one difficulty in filling the form of EAp2.

1
Mon May 5, 2014, 5:04 pm

Tenant's Project Scope

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Sunayana Jain  on 

I have a small office fit-out which is served by a 5 RTUs exclusively. In the tenant's scope of work is only the ductwork and lighting with lighting controls.

1
Sat Jul 26, 2014, 5:47 am
1
Wed May 7, 2014, 1:54 pm