Forum quick links
OPTION 2: Metered Water Use
EBOM-v4 WEp1:Indoor water use reductionposted by Lorne Mlotek on
I am a little confused here: Credit language states the following: • Meter fixtures and fittings and record metered data for one year to establish a water-use baseline. • For projects with at lea
Basic Manual Shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Emmanuel Gee on
Can basic manual operated fabric shades be used for areas that are above 500fc? Something such as a Draper Manual Flexshade? Thanks
Proposed building sharing bounding wall with neighbor building.
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
The building has two of its bounding walls shared with its neighbour buildings. First question is, is a shared bounding wall considered part of the envelope?
LEED online form
NC-2009 EAp2:Minimum Energy Performanceposted by Sylvain laporte on
Does someone knows why the leed online v4 form( so called newest in the documentation toolkit) does not include the 3 options as it was in the v3 form.
ASHRAE 62.1-2013 Version
NC-v4 EQp1:Minimum indoor air quality performanceposted by Adam Stoker on
Will compliance with the ASHRAE 62.1-2013 standard be acceptable for LEED v4 projects (even though the credit currently references ASHRAE 62.1-2010)?
Measuring water use in a commercial clothes washer
Healthcare-v2009 WEp1:Water use reductionposted by Mark Meaders on
We are looking to verify how the water use in a commercial clothes washer is calculated to see if it complies with the baseline of 9 gal/ CF/ cycle.
Re-certification of a LEED 2009 EBOM project in 2017
EBOM-2009 PIf1:Minimum Program Requirementsposted by Melissa Merryweather on
My client's successful LEED EBOM 2009 project was certified in 2012. Will my client have to upgrade to V4 when they re-certify or will they be allowed to continue with the LEED 2009 system?
Server Room
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by John Covello on
I am just seeking a clarification. Is a computer Server room the same thing as a "Data floor area" from the IEQ Space Matrix?
Proces water / include oven?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lise Dannesboe on
Hi!
Clinker
NC-2009 MRc4:Recycled Contentposted by Caroline PIN on
Dear all, Is the clinker a recycled material for cement ? (Cement clinkers are formed by the heat processing of cement elements in a kiln) Thank you for your help