Forum quick links
Redoing MRT measurements after preliminary review
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by American University on
GBCI pointed out to us during their preliminary review that one of our past engineers did an air temp reading in sample spaces rather than a mean radiant temp reading.
Modeling Laboratory Systems
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi, I am starting work on a laboratory building and have been looking at the standards to see how they apply.
Heating only system; Baseline modeling of DHW
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Markus, thanks a lot for your answer. Another issue appeared to this Heating only system - Baseline modeling of DHW (Domestic Hot Water). The Proposed model is having a gas fired boiler to provide
Is there a occupancy % under 100% that is still considered 100%?
EBOM-2009 PIf3:Occupant and Usage Dataposted by Vanessa Seibert on
In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f.
Metro Stations
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Lakshmi Suryan on
If the credit is applied on Metro stations , can i presume that the credit holds good only for office spaces or regularly occupied spaces within the station ?
local equivalent standards?
NC-2009 SSc1:Site Selectionposted by Christian Luft on
The project is located in Germany and is built according to german standards and regulations.
Default recycled content for Aluminum or Glass?
CI-2009 MRc4:Recycled Contentposted by Charles Chaloeicheep on
Hello, My project is using aluminum and glass fabrications made in China and neither fabricators has any information about the recycled content.
We are providing shared use
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Anne Agan on
We are providing shared use sidewalks that are 8ft wide to meet this credit. However, the signage requirement has been a discussion we consistently return to.
supplemental heating system
CS-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
additional heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.