Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p
ASHRAE 90 2007 item 9.4.4
NC-2009 EAp2:Minimum Energy Performanceposted by Iqbal Khalilullah on
Hi Marcus, Please advise me regarding ASHRAE 90.2007 mandatory provision item 9.4.4 which is written as follows: "All exterior building grounds luminaires that operate at greater than 100 W shall
Existing Biofuel Station on Campus
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by GTF CPRE on
Our project is on a university campus that has an existing biofuel station for fleet vehicles.
Regularly Occupied or Not?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Cynthia Estrada on
Hello- I don't know if anyone has asked this question or not, it is a rather unique situation.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Mark Zoeteman on
Option 1, Enhanced IAQ Strategies, paragraph B states spaces are to be exhausted where hazardous gases or chemicals may be present or used.
Requirements for recycle concrete
NC-2009 MRc4:Recycled Contentposted by Dw Barnes on
Is there a certain requirement/specification to use concrete that has been crushed from other sites as a material for another site?
Third Party Data Source
Retail-CI-v2009 PIf1:Minimum Program Requirementsposted by Erin Cubbison on
Hello, I was wondering if any one in the forum has experienced a more rigorous review of the enery and water usage data when using a third party data source vs.
Racks for visitors in residential project
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by LEED Pro Consultant on
Hello, what would be the percentage required of racks for visitors in a residential project?
Facilities off-site alllowed but cannot be double counted
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Nate Tsang on
Hello, I am currently working on a project and we are targeting LEED ND. As part of LEED ND, one of the buildings will be LEED NC certified.
Dilution Systems for Multi-use building
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Haley Duncan on
Hi, our project includes a winery production area and has different cleaning protocols then our office and tasting room spaces do. Does the dilution requirement apply to these types of spaces?