Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Light Pollution for Large Project Boundaries

Warehouses-EBOM-v4.1 SSc3:Light Pollution Reduction
posted by  Rick Fox  on 

I manage a 550k square foot warehouse operating at 24/7.  All of our building lights, are LED and point down at the ground.   Our pole lights are LED also and point down at a 45 degr

1
Fri Sep 1, 2023, 12:57 pm

Testing Equipment for Option 2

NC-v4 EQc4:Indoor air quality assessment
posted by  Gregory Patton  on 

Does anyone have a rec for simple testing equipment to meet Option 2?

Thanks!

1
Fri Aug 18, 2023, 2:15 am

Additional Source Control and Monitoring; sensor locations

NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategies
posted by  Chris Flint Chatto  on 

Wondering what this credit requires for location of IAQ sensors.  Trying to evaluate for a large, "laboratory-like" project with many spaces that have potential pollutants.  I understand

0

Downstream Implementation of Analysis Outcomes

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Charles Boechler  on 

This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance.

1
Wed May 21, 2025, 7:07 pm

Seed Evaluator Tool Effectiveness?

Pilot-Credits IPpc89:Social equity within the community
posted by  Charles Boechler  on 

Is the Seed Evaluator the best tool for measuring social equity?

0

Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Charles Boechler  on 

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ

0
4
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Wed Aug 16, 2023, 6:06 pm

Interior element reuse in different project

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Nadia Azzam  on 

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).

0

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1:Transportation Performance
posted by  Michael Ling  on 

Good Day ! I would like to ask if anyone experienced that before: 

2
Associate Director of Asset Certification Services
Longevity Partners
LEEDuser Expert
0 thumbs up
Wed Aug 16, 2023, 3:29 pm

Water Calcultion for Commerical ID+C project

CI-v4 WEc1:Indoor water use reduction
posted by  Amgad Khattab  on 

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

1
Thu Aug 17, 2023, 6:03 pm