Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1:Transportation Performance
posted by  Michael Ling  on 

Good Day ! I would like to ask if anyone experienced that before: 

2
Associate Director of Asset Certification Services
Longevity Partners
LEEDuser Expert
0 thumbs up
Wed Aug 16, 2023, 3:29 pm

Water Calcultion for Commerical ID+C project

CI-v4 WEc1:Indoor water use reduction
posted by  Amgad Khattab  on 

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

1
Thu Aug 17, 2023, 6:03 pm

Lighting Control - Recording Studio

CI-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After

0

Option 2. Prescriptive Compliance

CI-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

kinda embarrassed to ask this one, but here goes...

6
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 15, 2023, 3:51 pm

Furniture

NC-v4 MRc5:Construction and demolition waste management
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Furniture

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Passive Survivability and Back-up Power During Disruptions

NC-v4 INc1:Innovation
posted by  Ridhwan Omar  on 

Hello LEEDUsers!

We have a resort hotel project in one of the islands in Micronesia.

6
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Mon Aug 14, 2023, 5:28 pm

UGR calculation

NC-v4.1 EQc6:Interior Lighting
posted by  Gustavo De las Heras Izquierdo  on 

Hello,

UGR can be calculated at different angles (30°, 45°, ... from nadir).

At what angle should the UGR be reported for credit compliance?

Thank you,

1
Fri Aug 25, 2023, 12:28 pm

Patient Rooms

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Vanessa Hostick  on 

Does anyone have experience documenting this pilot credit on a hospital?  It's unclear if the patient room should be included or excluded from the documentation and count.

0

locker roms

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Belén Palao  on 

Dear LEED coach, 

based on the All gender restrooms credit option 1 I had a consultation I wanted to make: 

3
LEED AP BD+C, WELL AP, Sustainable Building Consultant
ECOBUILD
LEEDuser Basic Member
14 thumbs up
Mon Aug 14, 2023, 4:05 pm