Forum quick links
Services on a college campus
NC-2009 SSc2:Development Density and Community Connectivityposted by Megan Recher on
We are working on a college campus and does anyone know if a college bookstore could count as retail? It is open to the general public.
Exterior LPD addendum i and 90.1-2010
CS-2009 EAp2:Minimum Energy Performanceposted by Martin K on
Hi, what surface type should be used for overhang construction if using Addendum i or 90.1-2010 version?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Jeff Wiedmeyer on
I have a client who has chosen to meet MPR#6 by selecting Option 2: USGBC Approved Data Template.
porcelain flooring Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by soha yamani on
Does porcelain flooring Tiles lie under mineral based flooring category ? if not what would be its requirements to comply with IEQ Credit 4.3: Low-Emitting Materials Flooring Systems ?
Doing both the Level II assessment and credit EA2.3 "ongoing Cx"
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Tom Kennedy on
Our team sees benefit to doing both, and making a deliberate effort to place energy-items into either the "audit" or "Cx" category (so we don't duplicate too much).
Furniture & Furnishings in MR Credits
CI-2009 MRc4:Recycled Contentposted by Patty Lloyd on
In LEED v3 CI are furniture and furnishings budget still required to be included in the MR credits 4,5, & 6?
No 2-year, 24 hour design storm data available
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Mario S. on
The 2 year, 24-hour design storm precipitation data is unavailable for the country. However, Historic rainfall data exists.
BPDO calculator and Furniture
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle Rosenberger on
As I understand it, IDC projects are required to use Actual Materials cost and to include furniture in that cost.
Support Buildings impact on Heat Island Effect
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Daniela Mendez on
We have a project with a support building with no FTEs, hence, it is not a certifiable building according to the MPRs and we will only be using it to count the materials waste management.
Lagre building modeling suggestion
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling is a huge one - a little more than 900 000 sq ft and it is not C&S.