Signed Contract with the CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Mohamed M. Abd Elhameed  on 

We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt.

5
CEO & Founder
The Construction Green Team
LEEDuser Basic Member
0 thumbs up
Thu Jun 30, 2016, 8:51 pm

Option 1: Calculated Water

EBOM-v4 WEp1:Indoor water use reduction
posted by  Ileana Delgado  on 

I am working on WE prerequisite for Indoor water use reduction and we decided to go with the 1st option.

3
Thu Jun 30, 2016, 8:10 pm

Minimum Energy Performance

EBOM-v4 EAp2:Minimum energy performance
posted by  Aqrab Ali Rana  on 

Dear All, I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas engines a

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Jun 30, 2016, 7:52 pm

Green cleaning products - Saudi Arabia

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Rosemary Chisholm  on 

Hi there! I am having a really hard time implementing a green cleaning program for existing buildings to comply with the Purchasing of Sustainable Cleaning Products and Materials.

5
Thu Jun 30, 2016, 4:06 pm

No more pressure washing with water only

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Nelina Loiselle  on 

We just received the following review comment: "The plan states that the building exterior is cleaned with high pressure water.

7
Wed Jun 29, 2016, 11:05 pm

Energy Simulation

NC-v4 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Hello Marcus, i want some clarification regarding HVAC Baseline and Proposed model.

8
Wed Jun 29, 2016, 4:44 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  Charalampos Giannikopoulos  on 

For a project that is less than 150,000 ft2 and has 6 floors of which 1 (the basement) is unconditioned would System 6 still be eligible for the project and not System 8?

3
Wed Jun 29, 2016, 3:44 pm

Stormwater pond outside boundary

NC-2009 WEc1:Water Efficient Landscaping
posted by  Derek Seifert  on 

Hello all, Our project is intending to use a LEED boundary that is only a portion of a larger site.

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Wed Jun 29, 2016, 1:37 pm

Unoccupied Cooling/Heating

NC-2009 EAc1:Optimize Energy Performance
posted by  SAMY Chamy  on 

Dear All:- Our project located in Pakistan and the client not interested in Unoccupied cooling /Heating so it not considered in proposed case energy simulation But we consider Unoccupied cooling

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 29, 2016, 7:02 am

Possible Points for Europe?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sebastian Stumvoll  on 

We are pursuing LEED credits for a Workshop/Office Building in Munich Germany.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Jun 28, 2016, 8:17 pm