Signed Contract with the CxA
NC-2009 EAc3:Enhanced Commissioningposted by Mohamed M. Abd Elhameed on
We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt.
Option 1: Calculated Water
EBOM-v4 WEp1:Indoor water use reductionposted by Ileana Delgado on
I am working on WE prerequisite for Indoor water use reduction and we decided to go with the 1st option.
Minimum Energy Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Aqrab Ali Rana on
Dear All, I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas engines a
Green cleaning products - Saudi Arabia
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Rosemary Chisholm on
Hi there! I am having a really hard time implementing a green cleaning program for existing buildings to comply with the Purchasing of Sustainable Cleaning Products and Materials.
No more pressure washing with water only
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Nelina Loiselle on
We just received the following review comment: "The plan states that the building exterior is cleaned with high pressure water.
Energy Simulation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, i want some clarification regarding HVAC Baseline and Proposed model.
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For a project that is less than 150,000 ft2 and has 6 floors of which 1 (the basement) is unconditioned would System 6 still be eligible for the project and not System 8?
Stormwater pond outside boundary
NC-2009 WEc1:Water Efficient Landscapingposted by Derek Seifert on
Hello all, Our project is intending to use a LEED boundary that is only a portion of a larger site.
Unoccupied Cooling/Heating
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear All:- Our project located in Pakistan and the client not interested in Unoccupied cooling /Heating so it not considered in proposed case energy simulation But we consider Unoccupied cooling
Possible Points for Europe?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sebastian Stumvoll on
We are pursuing LEED credits for a Workshop/Office Building in Munich Germany.