NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mike D on
For option 3, do measurements have to be taken more than once?
Option 3 daylight measurement
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Stella Stella on
Hi, We are proposing to carry out the Option-3 daylight measurement in our project to demonstrate compliance.
Level of Participation by Enhanced CxA in Fundamental Cx Tasks
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Annalise Reichert on
We are currently working on a project where an independent third party was contracted to perform Enhanced Commissioning tasks, and a disinterested employee of the General Contractor performed Funda
Regularly Occupied Space
EBOM-2009 PIf3:Occupant and Usage Dataposted by Saul Pichardo, AIA on
Hello, Where can I find information on what is considered "regularly occupied space" in a warehouse facility that has most of its space dedicated to product storage and much of the open area used
Shade from trees outside of site
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Summer Gorder on
Can the shade from tree canopy include trees that are outside of the project boundary?
Doubling Area
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Karen Loysen on
A site has reflective pavement (SRI 29+) that is partially shaded by trees. Do I count that area as shaded and subtract it from the area of reflective pavement?
Subtraction of utility's renewable energy sources from RECs?
NC-2009 EAc6:Green powerposted by Erica Downs on
This may be a silly question, but I said I would ask... If we can document that XX% of our client's utility-provided electricity is from renewable sources (wind, hydro, solar), can they just purch
Asphalt Paving Coatings?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Nicole Kimoto on
The client has decided to proceed with providing new asphalt paving instead of concrete, but they are planning on providing a coating or thermoplastic paint over.
Partial Purchased Energy
NC-2009 EAp2:Minimum Energy Performanceposted by Christopher Strunk on
Good afternoon. I'm getting started on a model for a county courthouse office expansion. In its pre-renovated state, the facility purchases both HW and CW through the local utility.
Pressure loss calculation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Yaser Al Sharif on
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre