Forum quick links
EBOM Pilot Credit 56
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Maria Vasapollo on
Does the building need to be a warehouse? Can the PV system be in the parking lot in lieu of a rooftop? Please advise.
Applicability of LEED interpretations
NC-2009 EAc1:Optimize Energy Performanceposted by Chilufya Lombe on
Hi, we have been using the "Advanced Energy Modelling For LEED" document and have a question one some of the exceptional calculation methodology examples.
Furniture Systems and the View Credit
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Christine Spendiff on
I am working on an renovation of an historic building for the government. The layout is great for the view credit.
Legal parking capacity vs. LEED
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Marcio Alberto Casado Pereira on
Greeting folks, The local code requires 1 parking spot per 100m². Our project has 17,890m², which leads to 178,9 parking spots.
Ceramic tile wall coverings
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Anders Olson on
I am working on a retail project (like the schools rating system, the retail rating system also has this 'Ceiling and Wall Systems' credit option) that will have ceramic tiles installed on walls in
Zone population
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Billy Nguyen on
Hi all, I was doing the calculation for my office, and this confused me about the zone population because my office has 2 zones, office zone and conference rooms.
New Building vs Existing Building Renovation?
NC-2009 EAc1:Optimize Energy Performanceposted by Ashonta Langdon on
I have a project where there will be an addition to an existing building that is also being renovated.
Complicated Open Space/Habitat Protection, LEED Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ken Scalf on
We are attempting to achieve exemplary performance in open space and protection of habitat.
Ever changing not published requirements
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Susann Geithner on
Maybe I just had bad luck with the reviewer, but I'm doing a recycling project in a LEED EBOM building. So we do have recycling in place.
LEED Form L-8 for WEp1 CS
CS-2009 WEp1:Water Use Reductionposted by charles bell on
Where can we find this? Thanks