Tennant HVAC System Unknown

CS-2009 EAc1:Optimize Energy Performance
posted by  Marco Marco  on 

Hi all, I am working on a whole building simulation according to Appendix G. The 10 storey building is divided on 3 tennants.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 13, 2012, 6:42 pm

CS project: How do I know the regularly occupied spaces?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Susan M. Kaplan  on 

Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 13, 2012, 12:26 pm

How to count interior structural walls

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Alessio Zampaglione  on 

I found a contrasting information about how to count the interior structural wall.

8
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Fri Apr 13, 2012, 12:04 pm

Would permanent and attached seating count in roof calculations?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maria Fiorelli  on 

I have a roof of a building which has a light colored concrete surface and should in theory meet the requirements of the credit.

3
Default Avatar
Lorax Partnerships, LLC
LEEDuser Basic Member
6 thumbs up
Thu Apr 12, 2012, 1:15 pm

Absorption chiller in baseline model

NC-2009 EAp2:Minimum Energy Performance
posted by  Jens Apel  on 

Dear all, Sorry in advance for this lengthy thread. In a current (European) project the certifying building will be supplied with district heat from a large city network.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 12, 2012, 5:27 am

Social meeting residential building terrace FTE/visitors calc.

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nadia Ayala  on 

Hi everyone, I have a project (residential building) that has a roof terrace with self-service amenities such as kitchenette, chimney, lounge areas, etc.

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Apr 12, 2012, 1:49 am

Renewable Energy Source Summary

Schools-2009 EAp2:Minimum Energy Performance
posted by  Sara Goenner Curlee  on 

I'd like to understand better how to input what is needed in Table L-1 for our solar thermal system (our solar PV system was easy to input).

3
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Wed Apr 11, 2012, 6:29 pm

Building Occupants - Daycare Center

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Iris Amdur  on 

Our office building includes a daycare center, with approx 100 kids on a daily basis. Would the kids be factored into the calculations using the same method of transportation as their parents?

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Apr 11, 2012, 5:23 pm

For Project outside US, Target Finder seems invalid?

CS-2009 EAp2:Minimum Energy Performance
posted by  yu-ju Kao  on 

Our project is located in Asia, and the Target Finder is to compare the project to a US national database, I assumed that it does not work for projects outside US.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 11, 2012, 2:21 pm

Can Atriums or shaded open spaces still qualify for the credit?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Ahmed Mosa  on 

In hot humid climates we tend to shade open spaces or design it as an Atrium, and since it's a "pedestrian oriented accessible space" would this space still qualify for SS C5.2 ?

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 11, 2012, 1:13 pm