Water Use in a Horizontal Expansion
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neil Rosen on
What do you do if you are constructing a horizontal expansion but you have no plumbing fixtures in the expansion?
commissioning performance period
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Pablo Fortunato Suarez on
This is for a 1st time EBOM project (not recertification). If Six Sigma Projects were initiated 5 years prior to LEED registration but implemented every year thereafter until the present time: 1)
Authority having Jurisdiction
CS-2009 IEQp1:Minimum IAQ Performanceposted by Diego Prada on
We are working on a CS naturally ventilated office Building.
How to keep birds away from PV panels
Schools-2009 EAc2:On-Site Renewable Energyposted by Gendel Metlitsky on
How to keep birds away from PV panels on the roof - any suggestions?
Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Guillermo T. Adamo on
Hi, im working in the design of a petrol station persuing LEED certification.
Condensate meters
EBOM-2009 WEc1:Water Performance Measurementposted by Andrea Marzullo on
1. Is anyone using condensate for make-up to their cooling tower? 2. If so, what size and type of meter is being used? 3.
Standard path vs alternative compliance approach?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Danielle Caestecker on
How do I decide which one to pick?
Exhaust requirement in C&S Building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rubén M. R. on
We have a C&S building and we asume that it will be occupied by corporate offices.
Change the version of LEED - EB - O & M (V.2008 to v.2009)
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Paola Figueiredo, Newton Figueiredo on
To whom it may concern, I have a question that I didn not find a solution in the credit-by-credit forum at this website. I have a project LEED-EB-O&M registred in the V.2008 but our client want
Achieve LEED CI Without any Mech. or Plumb. Changes?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Michelle Bracewell-Musson on
I have been asked to bid a LEED CI project where there will only be flooring, wall relocation, and added ceiling tiles to 7,000 feet of a 50,000 foot office space.