Forum quick links
GHG emission factor for 100% renewable electricity
NC-v4.1 EAp2:Minimum Energy Performanceposted by Vinh Huynh on
Hi,
Thermal Comfort Design alternative
NC-v4.1 EQc5:Thermal Comfortposted by SAMY Chamy on
Dear Concern
HVAC Backround Noise ( Process machine Noise)
NC-v4.1 EQc9:Acoustic Performanceposted by SAMY Chamy on
Dear Concern,
Zero lot line projects
NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations.
LEED Credit impact - On site electricity provision from LPG
NC-v4 EAp2:Minimum energy performanceposted by Robert Yates on
Hi
percentages
EBOM-v4.1 MRp1:Purchasing Policyposted by Karim Farah on
In the purchasing policy template document provided in the documentation toolkit, the proposed percentage is "75% meet sustainability criteria", where did this percentage come from and what i
WEp2 - add shower to awarded credit
NC-v4 WEp2:Indoor water use reductionposted by A&L SUSTENTABILIDADE on
During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points.
Submitting Innovation Credits in Design Phase
CI-v4 INc1:Innovationposted by Kerry Honsinger on
We are going to do the 2 part submittal for review and will submit most of the design credits. On the LEED Online website, Innovation is considered a design credit....
Tenant doesn't install water fixtures - can automatically get 1 point for Option 1 - water analysis?
CI-v4 IPc1:Integrative processposted by Michael on
Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope.