Option 2 Trasnportation Resources - Main Logistic Hub

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Dick Bernadi  on 

If our site are below 16 km to the main logistic hub, namely airport and freight village, does it count as two transportation resources or is it count as a single transportation resources?

0

LCA Software

CS-v4 MRc1:Building life-cycle impact reduction
posted by  Ragavendran A  on 

hi, we are proposing to make a life cycle assessment for a Core & Shell Project located in South India if chance can we proceed the LCA for the Whole building with ATHENA.

2
Sat Sep 1, 2018, 11:50 am

Lighting control for presentation in meeting room

NC-v4 EQc6:Interior lighting
posted by  Elyse Dufrene  on 

LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.

1
Fri Aug 31, 2018, 4:30 pm

Terminal of Airport

Credit Forums
posted by  Konstantina Kalliakoudi  on 

Hello,

I have a project  for the rating system LEED BD+C that is the Terminal of an airport. 

I was wondering if USGBC had any special guidelines for airports.

0

Credit to appeal

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, 
Hope you guy’s will be fine, need your favour and help  to clarify my below queries.

1
Fri Aug 31, 2018, 10:59 am

Venturi-type flow-through vacuum generators or aspirators

Hospitality-NC-v4 WEp2:Indoor water use reduction
posted by  Dionisio Franca  on 

Hi! What are the common uses of "venturi-type flow-through vacuum generators or aspirators"?

0

Proof of Satisfaction Post-survey and Corrective Actions?

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Michelle Bracewell-Musson  on 

Assuming we get a 30% response rate, it is my understanding that anything that met the dissatisfied (3 or less on a 7-point scale) criteria, must be corrected.  How do we measure this?&nb

1
Thu Aug 30, 2018, 9:59 pm

Review Comment: Leakage Rate Calculations

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Levi Jimenez  on 

More of a solution than a question I suppose;  I was recently provided the following review comment:

-----

0

excel spreadsheet locked problems

NC-v4 EQc2:Low emitting materials
posted by  alix fox  on 

The Products tab only has enough space for 9 items, and the "add a line" button doesn't work. I copied and pasted the blank lines with formatting in order to add all the items I need.

0

Drinking water test necessary if plumbing removed

Pilot-Credits EQpc105:Lead Risk Reduction
posted by  Zara Fahim  on 

The project site is on a historic district which had significant ground water and soil contamination. The project building is also an existing building that is being renovated for the project.

1