renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).
SRI required testing amounts
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Anna Korinkova on
Hello, could anybody tell me how we can state the number of SRI tests on a project? We intend to place gravel on the roof and provide a concrete parking log.
Baseline Chilled water pumps - G3.1.3.10
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The standard states that the pump power must be 22 W/gpm. If the project has two chillers and primary secondary circuits, whereby there is on pump per chiller in the primary circuits and
Commercial Interior; EAc1.3
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied
Exterior smoking policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andrey Tsvetkov on
Dear all, We have a question about exterior non-smoking policy on the project NC.
ASHRAE Standard
CS-2009 IEQp1:Minimum IAQ Performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.
Modeling semi heated space with mechanical ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Ashwin Kumar on
We are working on the energy modeling for Industrial Manufacturing facility in which some places can be classified as “Semi heated spaces” as per ASHRAE 90.1 2007 definition.
All open space that is counted toward this credit will be preser
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Agnieszka Rylska on
As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".
no permanent workstations
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by Agnieszka Rylska on
My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.