General Emissions Evaluation Fire Safing & Fire Blanket Ins.

NC-v4 EQc2:Low-emitting materials
posted by  Jerimiah Luckett  on 

Has anyone else come across the issue of finding a CDPH v1.1-2010 compliant Safing Insulation or SAFB Insulation? The contractor submitted the Owens Corning/Thermafiber SAFB and Safing and accord

8
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Thu Sep 6, 2018, 2:02 pm

IDc1.3 Green Housekeeping

Schools-2009 IDc1:Innovation in design
posted by  Danielle Dunn  on 

We received comments back on this credit stating that the policy must follow the EBOM Policy Model. However, we are working with a new construction school. Does this still apply?

1
Wed Sep 5, 2018, 9:44 pm

Toilet is required for Changing Room?

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Karl Heitman  on 

Hi.  I am inquiring if toilet is required as part of Changing Room for 2009 NC.  Can the Changing Room be just a shower and a small area to change?  Thanks in advance for your f

1
Wed Sep 5, 2018, 9:45 pm

ULEF documentation and LEED Online form

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Erica Downs  on 

How does one document use of a ULEF melamine in LEED Online? There is only a check box for "Product Contains No Added Urea-Formaldehyde".

7
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Wed Sep 5, 2018, 6:22 pm

Can zone population be zero for occupiable storage rooms for liquids and gels

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Edgar Arevalo  on 

Would it possible to input zero for an occupiable storage rooms for liguids and gels in the Minimum IAQ Performance Calculator?  I ask because the building in question is a maintenance garage

0

Lighting control for presentation in meeting room

NC-v4 EQc6:Interior lighting
posted by  Elyse Dufrene  on 

LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.

1
Fri Aug 31, 2018, 4:30 pm

Review Comment: Leakage Rate Calculations

EBOM-2009 EAp3:Fundamental refrigerant management
posted by  Levi Jimenez  on 

More of a solution than a question I suppose;  I was recently provided the following review comment:

-----

0

excel spreadsheet locked problems

NC-v4 EQc2:Low-emitting materials
posted by  alix fox  on 

The Products tab only has enough space for 9 items, and the "add a line" button doesn't work. I copied and pasted the blank lines with formatting in order to add all the items I need.

0

Drinking water test necessary if plumbing removed

Pilot-Credits EQpc105:Lead Risk Reduction
posted by  Zara Fahim  on 

The project site is on a historic district which had significant ground water and soil contamination. The project building is also an existing building that is being renovated for the project.

1
Tue Feb 13, 2024, 4:26 pm