Forum quick links
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.
Appeal after second review
posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?
Regularly Occupied Spaces in Convention Centers (LEED NC v2009)
NC-2009 PIf3:Occupant and Usage Dataposted by Megan White on
I want to confirm that Regularly Occupied Spaces in Convention Center projects are still defined as "Regularly occupied spaces are areas where one or more individuals normally spend time (more than
Reduce quantity of elevators
Pilot-Credits EQpc78:Design for active occupantsposted by Brenda Parker on
Has anyone done a study to prove that incorporating the features of this credit into their buildings has reduced elevator usage in a high-enough percentage to be able to reduce the quantity of elev
Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Lighting Controls in Jewelry Store
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Luke Wild on
We are working on a LEED project for a jewelry store which has millwork with lighting in it all around the store.
Bike stor. and shower facility sharing between NON LEED and LEED
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Amoy McGhee on
The school project we are working on has bicycle storage but no shower facility provided. This school is also connected to a NON-LEED building that has gymnasium.
preventive maintenance program
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Kimberly Hosken on
I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?