Forum quick links
Sustainable Purchasing: Durable Goods
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.
No mention of Private offices
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
Low Emitting Materials Tracking Spreadsheet
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Patrick Thibaudeau on
Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.
RE: Would we exclude interior walls that were never permitted?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.
Stadium / Arena
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Stacey Olson on
I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
Service life of a piece of HVAC equipment?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Rosemary Ziemann on
The link above for the 2007 ASHRAE Applications Handbook, HVAC Applications seems to be broken.
Energy and Water Data Reporting
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Yaneth Galindo on
I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to kno
Credit Denied
NC-2009 RPc1:Regional Priorityposted by Cynthia Estrada on
Hello All, Our project (zip 54703) just finished final design review and SSc1 was denied which was one of our RP credits as well.
Pilot vs v4 Demand Response - Full Automation
Pilot-Credits EApc8:Demand responseposted by Jennifer Wehling on
I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.