EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
LEED EBOM Eligibility
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Floor Coatings Compliance with IEQc4.3 in LEED 2009
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mario S. on
We have a concrete floor, and we plan on putting a coating on top of the concrete finish.
Shopping mall and Community Connectivity
posted by Nadia Azzam on
My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.
A partial ceiling area was affected by mold
Schools-2009 IEQc10:Mold Preventionposted by dia2000@gmail.com dia2000@gmail.com on
Hello, Our project is a LEED NC v2009. Due to a heavy rain season, it happened that some leakage lead to a partial grow of mold in some ceiling areas which are made from gypsum boards.
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.