Forum quick links
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Baseline System 2
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
How can I develop leed certificate service in my country?
NC-v4 EQp1:Minimum indoor air quality performanceposted by erdem özkan on
We provide Leed certificate and green building service but how are we developing this process in Turkey?
Minimum building energy performance
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by sam Alfassy on
based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.
Occupant Default Density vs. Actual density
CS-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, we are working on a C&S Mall project, is it permitted that we uncheck the Default density checkbox in IEQp1 form, and enter expected number of persons based on Architects / Engineers ex
Reuse of aggregates
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Fareed Alghimlas on
The building our team is trying to get it LEED certified has originally a shallow swimming pool with stones and aggregates in it for decorative purposes, during the performance period, the buildin
Satisfaction rating
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?
SSc7.2 roof gravel
CS-2009 SSc7.2:Heat Island Effect—Roofposted by S Nagarajan on
Dear Sir In a C&S LEED building, can we use coating over an existing gravel and if so whether the credit requirements will be fulfilled
Exhaust fan for chemical storage
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Yaser Al Sharif on
If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum pressure
Proposed case outside airflow rates
NC-2009 EAp2:Minimum Energy Performanceposted by Cagril Comert on
Hi, Our office building is ventilated with a constant volume AHU and conditioned by VRF system. AHU supplies 100% fresh air to the spaces, while VRF system provides heating and cooling.