Forum quick links
2 Bedroom Dormitory
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jason Chauvin on
I am currently designing a new university dormitory that includes rooms with 2 bedrooms and 2 desks in each room. In other words, each room houses 2 students.
MR4 & MR5 Credits LEED 2009 NC
NC-2009 MRc4:Recycled Contentposted by Brian Harris on
We are working on a project where the entire site needs 50'-0" deep compaction grouting at 6'-0" o.c to stabilize it.Then this public project will be pile supported.
Office occupancy - LEED CS 2009
posted by Elodie DUMAS on
Dear All, a question for a core and shell project. The LEED reference guide Appendix 1 states : “Core and shell projects that do not have the final occupancy counts must utilize the default occup
Residential Building
posted by K A on
Hello, A residential apartment building four stories high, all rented apartments to tenants and in construction since last year and due for occupancy this summer.
Problems with tracking spreadsheet
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Chris Miller on
I'm having problems with the Tracking Sheet in the Documentation Toolkit. The drop-down menus are empty.
too much light?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by kate dixon on
I calculated the floor area in rooms that had less than .15 that would contribute. however, many spaces have over .18 (too much light).
Basecase system selection for Hotel Building in a mixed use dev
CS-2009 EAc1:Optimize Energy Performanceposted by Kevin Sullivan on
We have a high rise mixed use development in Bangalore, India for which we are following Appendix G methodology for LEED Energy compliance.
Active control modulating the HVAC system as per space demand
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Lavanya Veerappa on
Does that mean a dedicated VAV box hooked with any one of the following meets the requirement: 1. Thermostat control 2. Occupancy sensor 3.
Reclaimed land from Sea
NC-2009 SSc1:Site Selectionposted by BOHYUN CHUNG on
Dear all, I'm doing LEED NC project and the building site is the reclaimed land from the sea. Of course, the owner just bought that site from another developer.