Forum quick links
water treatment outside LEED project boundary
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Adi Negara, LEED AP BD+C on
Dear all, We have a small LEED project (an office space with landscape) which located inside non-LEED construction project (factory), which will be conducted simultaneously.
Lighting in kWh?
CI-2009 EAc4:Green Powerposted by Maria Porter on
The answer to this one might be obvious, but I just can’t see it: EAc4 form says to “Provide numbers that correspond with the information provided in EAp2 and EAc1.3”.
Excited to Meet Everyone!
posted by Erika Duran on
Thanks for posting this Tristan. It's really interesting the community you and your team have built up. I will be happy to pass by - actually was interested in meeting and chatting with Mr.
How long must we follow thru on erosion control log?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Donald Bauman on
Our building and site is complete except for the grass. It was hydro-seeded last week but the grass that has taken is less than 75%.
the area meet the requrement must the same area?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
Hi guys Please help me solve below three question 1.LEED Guidance required 75% of all regularly occupied spaces meet the daylight requirements at both 9 a.m.
Filtering requirements
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Mike D on
If we capture rainwater and reuse it for irrigation, do we need to show any type of filtering or will this automatically acquire the credit?
PI Form 3 occupancy question, transient student vs retail
NC-2009 PIf3:Occupant and Usage Dataposted by Mike Stopka on
Hello I am submitting for a Multi-Family Residential apartment tower. It has retail space at the ground level.
Remediation prior to project start date
NC-2009 SSc3:Brownfield Redevelopmentposted by Lauren Fakhoury on
Does anyone know if LEED defines a project start date for this credit? I am working on a project where there was some ACM identified and abated back in 2009.
removing a credit from submission
posted by KIMBERLY KRAFT on
Hello LEEDuser members, We are in the process of addressing comments from our Design and Construction Preliminary Review.
Existing Building vs. New Construction
NC-2009 EAc1:Optimize Energy Performanceposted by Jenelle Shapiro on
I am working on a project in Tokyo, Japan. They are considering saving part of the exitsing building structure for multiple reasons.